By Ensign Annie Scroggs
Walking through the hangar bay of USS Bonhomme Richard (LHD 6) I pass dozens of Sailors mustered and standing by for any emergency that might arise as we charge the fire-main. The system has been dry for more than four months – drained to allow the necessary modifications to the ship while we are in dry-dock without worry of rupturing a pipe and flooding the ship with saltwater. Now it’s time to fill it back up and hope that it won’t leak. I notice the faces around me, waiting calmly. Whatever might happen, these Sailors are more than capable and motivated to respond to any situation immediately!
As the executive officer makes the announcement to start the process, I formulate my game plan. I can’t go to all my spaces at once nor is the fire-main in all of them. I decide to check the forward and aft shops to ensure everyone has left to go to their prospective watch stations. Starting in the fire pump room I find three of my Sailors methodically making notes of any potential problems in the space, paying special attention to the areas where contracted work had been completed. Suddenly, the Damage Control Assistant (DCA) announces we are charging the fire-main in this area of the ship. I wait in anticipation, but, as I glance at my Sailors I am sure they have this space under control; they are capable and motivated to ensure it is perfect.
Moving along, over the next five hours… I am roving the reefer decks, stern gate machinery rooms, forward and aft diesel, port and starboard after steering, compressor rooms, and aircraft machinery spaces and then back to them all again… circling continuously. I pause when I hear, “This is DCA from damage control central with a fire-main restoration update: Phase 1, Phase 2, Phase 3 and Phase 4 complete.”
I look around at my Sailors’ as they nod, smile and continue with the days work. We have just taken the first step to putting the best warship on the waterfront back together. This is the beginning of many accomplishments to come. As the cold saltwater moves through the ships veins I realize, “This is how it’s done!” Section by section, system by system, piece by piece we will put this ship back together and continue to strengthen our team as the crew of USS Bonhomme Richard: Capable and motivated!
The daily travails of putting a 40,500-ton warship through a major maintenance period. Part 1: USS Bonhomme Richard (LHD 6)
Showing posts with label san diego. Show all posts
Showing posts with label san diego. Show all posts
Friday, April 8, 2011
Thursday, March 17, 2011
FROM THE CAPTAIN’S CHAIR
Revolutionary Gators, Family and Friends,
We are a bit past halfway through our planned maintenance period and things couldn’t be going better! A brief update on our progress so far:
- Our engineering work and modernization is moving ahead well and the painting of our island is complete. Slowly but surely BHR is coming back to life and looking better than ever.
- The “Tiger Teams” of BHR Sailors doing lagging, painting, decks, and berthing are doing a marvelous job renovating spaces all over the ship. I am amazed at the quality of their work.
- We are prepping for our return to the water as preservation and painting of the hull, installation of valves and our shafts, screws and rudders continue. A few more sections of paint and the exterior will resemble that of the day she was launched. We expect to be waterborne again in mid-April.
- A few things remain for us to accomplish upon our return to pier 13. Installing our new computer network, finishing our MV-22 Osprey modifications and first stage of modifications to support the Joint Strike Fighter, applying new non-skid to the flight deck and a few major and minor tasks will be completed at the pier.
As of now, we are moving a little ahead of schedule due to the diligent efforts of all onboard and their continued dedication to excellence and real pride of ownership. Very groovy and very inspiring! I am proud to serve with them.Our immediate challenges lie ahead in completing our undocking in mid-April, preparations for our engineering light-off assessment, our combat systems light-off and returning to at-sea operational condition. We expect to begin a few brief underway periods in July and August with the first being our Sea Trials in mid-July.
Through all of this work, I cannot praise enough the actions, responsibility and attentiveness of your Sailors and Marines. Though we are in the yards, we’ve managed to maintain a work schedule that maximizes our down time while achieving our goals. Through activities such as the Gator cup, our various multicultural celebrations and plenty of time to spend in port with family and friends, we are, I feel, closer as a crew and a command as a whole. Our efforts continue to set the pace on the waterfront and our actions, on and off duty, an example for others to follow.
As we progress through the end of our DPMA period, I want to express my heartfelt gratitude for your efforts in accomplishing such an extensive overhaul. We must continue to be vigilant, keep safety in our minds first and foremost and see the job through to completion. I have no doubt we will emerge from this experience with Bonhomme Richard the pride of the waterfront and a truly Revolutionary Gator.
Capt. J. Harnden
Commanding Officer
USS Bonhomme Richard (LHD 6)